Drawing → IEC 61850 SCL Prototype · work in progress

Reading substation drawings into standard data

Utilities hold decades of single-line diagrams as images and PDFs. This prototype turns one into IEC 61850 SCL, the standard data format for substations, and measures how well each vision model does it. A model reads the drawing; plain code checks every answer against the standards before anything counts.

The approach

1. An assembled ontology

The vocabulary comes from standards organizations, not from us: IEC 61850 SCL for the substation, IEC CIM for what SCL doesn't cover, IEC 81346 and IEEE C37.2 for equipment classes and relay numbers.

What a drawing shows but no standard carries goes into a reviewed gap register, and the ontology grows one reviewed change at a time.

2. A checking harness

The model only fills in a fixed form. Code checks the form, checks that the wiring is consistent, sends errors back once, builds the SCL file and validates it against IEC's own schema.

How it works →

3. Measured, then reviewed

Every run is scored item by item against a hand-checked answer key. In the full tool, an expert reviews each drawing, fixes what's wrong and signs off; each signed-off drawing becomes a new answer key.

Results in detail →

Results so far

Loading results…

Charts, findings, time and cost → · Inspect every run → · How these models compare with other vision models →

Status: a prototype

The accuracy figures here are early and still work in progress. They come from one synthetic drawing in two renderings, a few runs per model and one answer key. Before drawing conclusions we need more sample runs, harder and real drawings, and better detection of errors.

Next steps

For research partners